Solenoid Resistor AGZE and Injector Relay
4A-GE
fk3914
4A-GZE
_fi0914
INSPECTION OF SOLENOID RESISTOR (4A-GZE)
MEASURE RESISTANCE OF SOLENOID RESISTOR
Using an ohmmeter, measure the resistance between +B and other terminals.
Resistance: 3 il each
- INSPECT INJECTOR RELAY
NOTE: The injector relay is located in the No. 2 junction block.
- No continuivy Continuity
Inspect Relay Continuity
(a) Check that there is continuity between terminals 1 and 3.
(b) Check that there is no continuity between terminals 2 and 4.
(c) Check that there is no continuity between terminals 3 and 4.
If continuity is not as specified, replace the relay.
Inspect Relay Operation
(a) Apply battery voltage across terminals 1 and 3.
(b) Check that there is continuity between terminals 2 and 4.
If operation is not as specified, replace the relay.
Post a comment